Submission Documents: 2013/332/PPF: Erect and install two 5Kw wind turbines on 15m high towers on 3m square bases. Midfield and Askalong, Ollaberry, Shetland, ZE2 9RU by Mr J Stephen, Rackwick, Ollaberry, Shetland Help Icon

This is the list of documents available for the submission 2013/332/PPF: Erect and install two 5Kw wind turbines on 15m high towers on 3m square bases. Midfield and Askalong, Ollaberry, Shetland, ZE2 9RU by Mr J Stephen, Rackwick, Ollaberry, Shetland.

Click on the links to view the individual documents in PDF format.

Name Type of Document Access View Document
Item Minute - 10 December 2013 Minute Public Open Document in PDF Format
(45 KB)
PL-21-13-F.doc Report Public Open Document in PDF Format
(112 KB)
PL-21-13-Apps.pdf Appendix Public Open Document in PDF Format
(1.46 MB)

 

View History of Submission