Submission Documents: 2018/186/PPF: The construction and operation of Mossy Hill Wind Farm with a maximum generating capacity of up to 50MW, comprising 12 wind turbine generators (WTGs) with maximum tip heights of 145m with associated infrastructure, by Peel Wind Farms (No.1) Ltd. Help Icon

This is the list of documents available for the submission 2018/186/PPF: The construction and operation of Mossy Hill Wind Farm with a maximum generating capacity of up to 50MW, comprising 12 wind turbine generators (WTGs) with maximum tip heights of 145m with associated infrastructure, by Peel Wind Farms (No.1) Ltd..

Click on the links to view the individual documents in PDF format.

Name Type of Document Access View Document
Item Minute - 15 April 2019 Minute Public Open Document in PDF Format
(289 KB)
PL-04-19-F.doc Report Public Open Document in PDF Format
(323 KB)
PL-04-19 Appendix 1.doc Appendix Public Open Document in PDF Format
(947 KB)
PL-04-19 Appendix A.doc Appendix Public Open Document in PDF Format
(820 KB)
PL-04-19 Appendix B.docx Appendix Public Open Document in PDF Format
(193 KB)
PL-04-19 Appendix C.pdf Appendix Public Open Document in PDF Format
(1.8 MB)
PL-04-19 Appendix D sm.pdf Appendix Public Open Document in PDF Format
(2.87 MB)
PL-04-19 Appendix E.pdf Appendix Public Open Document in PDF Format
(2.03 MB)

 

View History of Submission